| اكتشف الجزائر | من نحن؟ | منطقة الصحافة | اتصال |
According to what was reported by public television, the progress of the oil port expansion works reached 95%, while the rest of the works will be completed during the first quarter of next year.
The port of Skikda is considered an important port in the field of transportation of goods and oil (import and export), reaching a level of 18 million tons per year.
Note that as part of the ongoing project to extend this port, it is planned to create a second secondary pier with a new LNG loading station adapted to super LNG carriers with a capacity of 220,000 m3; create a new dock at various with a dock length of up to 846 ml, a draft of 15 m and a storage area of 16 Ha intended for loading and unloading containers and various liquid or solid products; reconvert the LNG-M1 loading station into an LPG loading station and create a new P4 oil station for loading and unloading large ships with a capacity of 250,000 tonnes with reinforcement and extension of the main pier.